-
Notifications
You must be signed in to change notification settings - Fork 5
Mission Requirements
1. The team must specify and buy the modules: Solar panels, Antenna and Structure.
Mission objective I
2. The team must do the integration and test of all subsystems of the FloripaSat.
Mission objective I
3. The team must develop a ground station.
Mission objective II
4. FloripaSat must establish a radio connection with a Ground Station.
Mission objective II
5. The team must develop and test all the core modules of the cubesat: EPS, OBDH, TT&C and ADCS.
Mission objective III
6. FloripaSat must be able to transmit data from its payloads.
Mission objective IV
7. FloripaSat must be able to transmit relevant data from its core modules.
Mission objective IV
8. FloripaSat must comply with P-POD standard launch system.
Defined by the Launcher (GAUSS).
9. All parts shall remain attached to the FloripaSat during launch, ejection and operation. No additional space debris will be created.
Compliance with CDS 3.1.2
10. No pyrotechnics shall be permitted.
11. CubeSat hazardous materials shall conform to AFSPC MAN 91-710, Volume 3. Link
12. FloripaSat must operate at Sun-Synchronous orbit: 650 km.
Compliance with Launcher (GAUSS) and CDS 3.2.1.
13. FloripaSat team must obtain documentation of proper licenses for use of amateur frequency.
Compliance with CDS 3.4.1 and 3.4.1.1
14. FloripaSat will comply with Brazil's radio license agreement and restrictions.
Compliance with CDS 3.4.2
15. CubeSats mission design and hardware shall be in accordance with NPR 8715.6 to limit orbital debris.
Compliance with CDS 3.4.3
16. Public commands must be well documented and provided in a public channel for the AMSAT community.
Compliance with AMSAT regards.
17. FloripaSat must have the capability to receive a transmitter shutdown telecommand.
Compliance with FCC and IARU regulation