Skip to content

Phase12 formal transition#62

Merged
kenanay merged 6 commits intomainfrom
phase12-formal-transition
Mar 14, 2026
Merged

Phase12 formal transition#62
kenanay merged 6 commits intomainfrom
phase12-formal-transition

Conversation

@kenanay
Copy link
Owner

@kenanay kenanay commented Mar 14, 2026

Freeze PR Template

Gate Run

  • Run ID:
  • Evidence Path (evidence/run-<id>/):

Gate Verdicts

  • ABI (ci-gate-abi):
  • Boundary (ci-gate-boundary):
  • Tooling Isolation (ci-gate-tooling-isolation):
  • Constitutional (ci-gate-constitutional):
  • Workspace (ci-gate-workspace):
  • Hygiene (ci-gate-hygiene):
  • Performance (ci-gate-performance):
  • Summary (ci-summarize):

Tooling Isolation Guard

  • Perf/preempt tooling touched in this PR: yes/no
  • If yes, kernel touch = 0: yes/no
  • Tooling isolation evidence path (evidence/run-<id>/gates/tooling-isolation/):

Contract Change

  • Changed contracts: yes/no
  • If yes, exact paths:

RFC / Waiver

  • RFC link (if required):
  • Waiver link (if required):

Claim Check

If this PR claims Completed/Production-ready, all must be true:

  1. summary.json verdict is PASS
  2. test + benchmark evidence linked
  3. related docs updated
  4. architecture review note linked

Notes

  • Planned gates may be hard-fail stubs during freeze hardening.
  • Do not merge feature work into mainline during active freeze.

kenanay added 6 commits March 15, 2026 02:12
tag: phase10-phase11-official-closure
evidence_run_p10: local-freeze-p10p11 (PASS, 20 gates)
evidence_run_p11: local-phase11-closure (PASS, 9 gates)
remote_ci_run: 22797401328 (ci-freeze, success)
current_phase: 12
authority: ARCHITECTURE_FREEZE.md
closure_state: LOCAL_CLOSURE_READY
current_phase_pointer: 12 (updated from stale 10)
gates_passed: 20/20
evidence_run: run-run-local-phase12c-closure-2026-03-11
generated_at: 2026-03-14T23:48:57Z
prerequisites_remaining: obtain_remote_official_confirmation
…READY

- Update date: 2026-03-15
- current_phase_pointer: 12 (was stale 10)
- Phase-10/11 official closure tag documented
- Phase-12 closure state: LOCAL_CLOSURE_READY (20/20 gates PASS)
- Phase-12 closure candidate tag: phase12-official-closure
- Exit criteria snapshot updated
- Risk concentration item 3 resolved
- Roadmap decision 5.1 items marked complete
@kenanay kenanay merged commit 4015835 into main Mar 14, 2026
2 checks passed
kenanay added a commit that referenced this pull request Mar 15, 2026
…itch PASS

Phase-12:
  - closure state: LOCAL_CLOSURE_READY -> CLOSED (official closure confirmed)
  - official CI: ci-freeze run 23099070483 (PR #62, success)
  - official tag: phase12-official-closure-confirmed at 1d79d4b

Phase-13:
  - state: PREPARATION_ACTIVE -> KILL_SWITCH_GATES_PASS
  - all 6 kill-switch gates PASS at 0ec4bb5
  - tag: phase13-kill-switch-gates-pass
  - gate fix: PR #63 merged (diagnostics-consumer allow-list)
kenanay added a commit that referenced this pull request Mar 15, 2026
…itch PASS (#64)

Phase-12:
  - closure state: LOCAL_CLOSURE_READY -> CLOSED (official closure confirmed)
  - official CI: ci-freeze run 23099070483 (PR #62, success)
  - official tag: phase12-official-closure-confirmed at 1d79d4b

Phase-13:
  - state: PREPARATION_ACTIVE -> KILL_SWITCH_GATES_PASS
  - all 6 kill-switch gates PASS at 0ec4bb5
  - tag: phase13-kill-switch-gates-pass
  - gate fix: PR #63 merged (diagnostics-consumer allow-list)
kenanay added a commit that referenced this pull request Mar 16, 2026
…SS state (Constitutional Rule 7)

Phase status updates:
- Phase-10/11: OFFICIALLY CLOSED (remote CI run 22797401328)
- Phase-12: OFFICIALLY CLOSED (remote CI run 23099070483, PR #62, tag phase12-official-closure-confirmed)
- Phase-13: KILL_SWITCH_GATES_PASS (6/6 gates PASS, tag phase13-kill-switch-gates-pass at 0ec4bb5)
- CURRENT_PHASE=12 (formal transition at 0adb2a8)

Files updated:
- ARCHITECTURE_FREEZE.md: CI gate list updated to 23-gate chain, status section updated, version 1.4→1.5
- docs/roadmap/freeze-enforcement-workflow.md: Section 2.1 full gate list + execution order rationale + gate order change protocol; Section 2.3 gate order lock note
- docs/roadmap/README.md: Phase status and CURRENT_PHASE pointer corrected
- docs/development/PROJECT_STATUS_REPORT.md: Phase-12 CLOSED, Phase-13 kill-switch status, date updated
- docs/development/DOCUMENTATION_INDEX.md: CURRENT_PHASE=12, Phase-12/13 status corrected
- docs/steering/product.md: Current Status section updated with all phase closures and 23-gate count
- docs/steering/tech.md: Mandatory Gates section updated with full 23-gate ordered list

Refs: Constitutional Rule 7 (Documentation Synchronization)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant