Skip to content

duke8253/h2_bed_tramming

Repository files navigation

Note:

g-code files ends with 2mm uses the new feeler gauge block provide by Bambu Lab in their updated wiki page.

Bambu Lab wiki page for H2 series bed tramming: wiki

2mm Feeler gauge block print profile: download

How to use the g-code files:

  1. Initial Setup with Nozzle:

    • The right nozzle will move directly above the first bed tramming point, and the heat bed will raise until it’s near the nozzle.
    • Slide a piece of paper between the nozzle and the bed. Adjust the bed screw until you feel slight resistance when moving the paper.
    • You’ll have 1 minute to complete this step.
  2. Swap to Indicator Mount:

    • The heat bed will lower, and the toolhead will move to the offset position, aligning the dial indicator tip directly above the first tramming point.
    • Remove the right nozzle and install the indicator mount with the indicator pre-installed.
    • You’ll have 1 minute to complete this step.
  3. Zero the Dial:

    • Once the heat bed raises to the final position, zero the dial.
    • For each tramming point, you’ll have 30 seconds to adjust the screw.
  4. Tramming Adjustment:

    • At each tramming point, adjust the screw until the dial reads as close to 0.00mm as possible.
  5. Repeat Rounds:

    • The process will repeat for up to 10 rounds.
  6. Stopping Criteria:

    • You may stop early if, at the end of any round, all points read 0.00mm and no adjustments were made during that round.

About

No description, website, or topics provided.

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors

Languages