Skip to content

Roadmap

drforbin edited this page Mar 20, 2020 · 1 revision

Lepton EDA roadmap

This is a rough roadmap of objectives for lepton development.

New stable release

Before a stable release, I (@vzh) would want the following things to have been done:

  • Finish renaming of the tools and main functions in the repository.

This is very important and should be enough to release 1.10.

  • Finish refactoring of the configuration system (I would very appreciate any help on this).
  • Add John Doty's spice-noqsi backend to the repo (and probably gnet-makefile).
  • Finish refactoring of lepton-netlist (requires much testing).

These three are, IMO, enough to release 2.0.

Clone this wiki locally