Skip to content

build(deps): bump actions/setup-go from 5 to 6

76dfcde
Select commit
Loading
Failed to load commit list.
Merged

build(deps): bump actions/setup-go from 5 to 6 #1

build(deps): bump actions/setup-go from 5 to 6
76dfcde
Select commit
Loading
Failed to load commit list.
GitHub Advanced Security / CodeQL completed Feb 24, 2026 in 1s

1 configuration not found

Warning: Code scanning cannot determine the alerts introduced by this pull request, because 1 configuration present on refs/heads/main was not found:

Default setup

  • ❓  /language:actions

View all branch alerts.