OpenAug 11, 2025
No due date
•Last updated This is the milestone for BlueLib 3.0.0.
Below is a list of all the tasks that must be completed before the release of version 3.0.0. Additional tasks may be added if we feel that 3.0.0 is not significant enough.
60% complete
List view
0 issues of 2 selected
- Status: Open.#121 In MeAlam1/BlueLib;
- Status: Draft (not ready).MeAlam1/BlueLibnumber 163#163 In MeAlam1/BlueLib;