Skip to content

feat: split FiniteElementBase into nonvirtual and virtual interfaces #15005

feat: split FiniteElementBase into nonvirtual and virtual interfaces

feat: split FiniteElementBase into nonvirtual and virtual interfaces #15005

Triggered via pull request December 15, 2025 19:27
Status Cancelled
Total duration 19m 2s
Artifacts

ci_tests.yml

on: pull_request
semantic_pull_request
6s
semantic_pull_request
is_not_draft_pull_request
5s
is_not_draft_pull_request
Matrix: cpu_builds
Matrix: check_code_style_and_documentation
Matrix: cuda_builds
if_not_unassigned_pull_request
3s
if_not_unassigned_pull_request
are_submodules_in_sync
10s
are_submodules_in_sync
baseline_log
8s
baseline_log
code_coverage  /  build_test_deploy
18m 4s
code_coverage / build_test_deploy
run_integrated_tests  /  build_test_deploy
1m 24s
run_integrated_tests / build_test_deploy
check_that_all_jobs_succeeded
2s
check_that_all_jobs_succeeded
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Rockylinux CUDA (8, clang 17.0.6, cuda 12.9.1) / build_test_deploy
Process completed with exit code 8.
run_integrated_tests / build_test_deploy
The run was canceled by @wrtobin.
run_integrated_tests / build_test_deploy
The operation was canceled.
code_coverage / build_test_deploy
The run was canceled by @wrtobin.
code_coverage / build_test_deploy
The operation was canceled.
check_that_all_jobs_succeeded
Process completed with exit code 1.
GEOS CI
The run was canceled by @wrtobin.
GEOS CI
The run was canceled by @wrtobin.
GEOS CI
The run was canceled by @wrtobin.
GEOS CI
The run was canceled by @wrtobin.
GEOS CI
The run was canceled by @wrtobin.