CalLite 4.5.0 - based on CalSim 3 2021 DCR
What's Changed
This is the internal release for CalLite that was first based on a CalSim 3 model. This 2022 effort involved CVM staff and consultants (Stantec, MBK, HDR). No GUI update came with this tag. It was presented in CWEMF but we have not shared this widely to the public.
New Contributors
Full Changelog: CalLite_v3.1.0...CalLite_v4.5.0
CalLite V. 3.1.0
CalLite v. 3.1.0 was constructed by implementing 2015 Delivery Capability Report (DCR) updates to CalLite v. 3.00.
CalLite V. 3.00
CalLite 3.00 contains expanded simulation capabilities, complimented with an updated graphical user interface. Major enhancements since the last release (CalLite 2.01) include:
• Utilization of WRIMS2 engine
• Dynamic San Joaquin simulation
• “Quick Select” options for running typical regulatory environments (D-1485, D-1641, and BO)
• D-1485 regulatory options
• Payback wheeling (D-1485 regulatory environment)
• Climate Change scenarios for Early Long Term and Late Long Term Q1-Q5 based on the BDCP analysis
• Los Vaqueros enlargement
• Shasta enlargement
• San Joaquin River restoration
• B2 Actions
• Generation of WSI-DI curves
• Forecast Allocation Method (FAM)
• Custom results (MTS/DTS Tree)
• Batch run capability
• Mass balance schematic
CalLite V. 2.00
As with the previous GoldSim-based CalLite, Version 2.00 has the following scenario options:
(1) Existing and Future land use conditions;
(2) Sea level rise options;
(3) South of Delta demand options;
(4) D-1641 and other Delta standards and regulations; and
(5) CVP and SWP allocation procedure options.
This new version of CalLite contains enhancements over the previous GoldSim-based CalLite, which includes the following:
• More detailed representation of the south of Delta area
• Ability to model SWP contractor Article 21 and 56 deliveries
• Detailed representation of CalSim II project deliveries
• Optional CVP operations and facilities (Cross-Valley Canal Wheeling, Joint Point of Diversion (JPOD), and Intertie)
• Addition of Biological Opinion (BO) Reasonable and Prudent Alternatives (RPAs) regulatory standards
• Inclusion of State Water Resources Control Board (SWRCB) Delta Flow Criteria
• Web map capability to view CalLite model features overlaid on Google Maps.