Skip to content
Nicholas Siciliano-Salazar edited this page Mar 26, 2018 · 10 revisions

Type: Daily Scrum


Have Done:

  • Documented frontend/AI Socket.IO events needed for integration

Currently:

  • (3/28)AI Training/Optimization
  • (4/4)Prototype Finalization
  • (3/30)Integrating client frontend (serving frontend)
  • (2/30)Building out socket integration

Next:

  • (4/4) Feature Freeze Finalization

Roadblocks:

  • Extend AI Optimization to the end of the week
  • Extend Integrations to the end of the week as they are intertwined
    • Server Frontend
    • Socket.IO

Clone this wiki locally