Building-Block

Background

The building block model (BBM) is a regulatory framework that ensures a firm earns a revenue stream with a present value equal to the present value of its expenditure stream1.

The Essential Services Commission (ESC) in Victoria regulates water businesses using the BBM to determine the maximum allowable revenue that a water utility can recover from customers through tariffs.

In the context of Victorian water utilities, the BBM is a forward-looking cost-of-service framework that ensures that utilities can recover efficient costs of providing water and sewerage services (including a fair return on investment), while protecting customers from monopoly pricing.

Project

This project prepares a regulatory financial model that implements the BBM and returns comprehensive financial projections, pricing schedules and key performance indicators.

The model enables scenario analysis across numerous parameters (eg., interest rates, customer growth, capital expenditure), and can model uncertainty performing Monte Carlo simulations.

Modelling steps are as follows:

  1. Load entity initial period financial statements
  2. Load forecast capex and opex data
  3. Calculate asset depreciation schedules (accounting and regulatory)
  4. Build a regulatory asset base (RAB) reconciliation
  5. Compute revenue requirements (return + opex + depreciation)
  6. Determine prices to match revenue requirements across 5-year periods
  7. Process non-regulated income and expenditure
  8. Return comprehensive financial projections, pricing schedules and KPI's

The regulatory building block component of this is represented below:

flowchart TD
    A(Opening RAB) -->B(Depreciation on<br/>opening RAB)
    C(Regulatory capex) -->D(Depreciation<br/>on capex)
    I(Regulatory<br>opex) ----> J(Revenue requirement) 
    B --> E(Closing RAB)
    D --> E
    A --> E
    C --> E
    B ----> H(Regulatory<br>depreciation)
    D ----> H
    E --> F(Regulatory<br>rate of return)
    F --> G(Return on RAB)
    H ----> J(Revenue requirement) 
    G ----> J
    J -.-> K(Prices)
    J -.-> L(Quantities)
Loading

Features

Scenario analysis

The following are inputs to the model:

  • Annual capital and operating (capex & opex) expenditure
  • Interest rates and inflation
  • Allowable return on equity
  • Percentage of fixed versus variable residential tariff

Sensitivity analysis

Designed to highlight impact of deviations in BBM inputs implicit in prices from that actually incurred.

  • Deviation of water usage from that assumed in price submission / building block approach
  • Deviation of incurred cost of debt from that assumed in price submission
  • Deviation of incurred inflation for opex (wages, electricity & other) and capex from that assumed in price submission

Sensitivities are assessed over 5 scenarios (VH, H, M, L, VL).

Opex is specified as a percentage deviation from baseline.

Other uses

While this project focuses on Victorian water utilities regulated by the ESC, the BBM is the standard regulatory framework used in many regulated infrastructure industries internationally.

The table below (hat tip to ChatGPT) summarises application of the BBM across industries and jurisdictions.

Jurisdiction / Sector Regulator(s) Application of BBM Key Features / Differences
Victoria - Water Essential Services Commission (ESC) Price determinations for urban & rural water utilities PREMO framework (Performance, Risk, Engagement, Management, Outcomes) adds incentive overlay; RAB indexed to CPI
Australia - Energy Networks Australian Energy Regulator (AER) Transmission & distribution of electricity and gas Extensive incentive schemes: Efficiency Benefit Sharing Scheme (EBSS), Capital Expenditure Sharing Scheme (CESS), Service Target Performance Incentive Scheme (STPIS)
Australia - Transport (Rail & Airports) State access regulators; ACCC (airports in past) Rail access charges, airport services BBM applied to access pricing; some regimes have light-handed monitoring rather than full revenue caps
Australia - Telecoms (historical) ACCC Fixed-line access services (Telstra) BBM applied pre-NBN; now moving towards different wholesale frameworks
UK - Water (Ofwat) Ofwat Water and sewerage utilities RPI-X / CPI-X regulation; strong use of outcome delivery incentives (ODIs)
UK - Energy (Ofgem) Ofgem Electricity & gas networks RIIO model (Revenue = Incentives + Innovation + Outputs) builds on BBM with strong innovation incentives
UK - Telecoms (Ofcom) Ofcom Wholesale access pricing BBM applied to Openreach network (BT Group); hybrid with competitive elements
New Zealand - Energy Commerce Commission Electricity distribution & transmission, gas pipelines BBM introduced in 2010; similar to AER model but adapted to smaller market
European Union - Energy & Water National regulators (e.g., ERSE in Portugal, CRE in France) Energy networks, water pricing EU requires transparent cost-based methods; most adopt BBM/RAB regulation
United States - Energy, Water, Telecoms State Public Utility Commissions (PUCs), FERC (federal energy) Rate-of-return regulation (historical test years) Functionally similar to BBM but ex post; based on historic costs rather than forecast efficiency
Canada - Energy & Water Provincial utility boards Rate-of-return regulation Similar to US; ex post, less use of incentive schemes
Latin America (Chile, Peru, Brazil) Sectoral regulators Electricity & water utilities BBM applied; often ex ante and benchmarked against "model company" assumptions
Asia (Singapore, Hong Kong, India) National regulators Energy & water BBM or hybrid RAB-based methods; often used to attract infrastructure investment

In summary

  • Australia & UK: Ex ante, forecast-based BBM with efficiency and service incentives.
  • US & Canada: Ex post, historic "rate-of-return" model (building block in substance but backward-looking).
  • Europe & elsewhere: Mix of BBM and RAB-based methods, often mandated by law to ensure cost-reflective, transparent pricing.

References

AER Financeability guideline (1)
AER Financeability guideline (2)
Assessing the Financeability of Regulated Water Service Providers
Assessing Funding Models for Water Services Provision
Reforming the economic regulation of Australian electricity distribution networks
2023 water price review Guidance paper

Footnotes

  1. Wikipedia

About

The building block model, when applied correctly and consistently over time, ensures that the firm earns a revenue stream with a present value equal to the present value of its expenditure stream.