Skip to content
Open
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
198 changes: 198 additions & 0 deletions docs/mainnet-launch-checklist.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,198 @@
# 🚀 PrivacyLayer Mainnet Launch Checklist

> **Status:** Pre-Launch
> **Last Updated:** 2026-03-25
> **Version:** 1.0

This comprehensive checklist ensures PrivacyLayer is ready for mainnet deployment. All items must be completed and verified before launch.

---

## 🔐 Security Checklist

### Cryptographic Security
- [ ] **BN254 Implementation Verified** - Confirm BN254 host functions match specification (CAP-0074)
- [ ] **Poseidon Hash Verified** - Confirm Poseidon2 host functions match specification (CAP-0075)
- [ ] **Circuit Security Review** - Independent review of Noir circuit logic
- [ ] **Nullifier Collision Analysis** - Verify no collision vulnerabilities
- [ ] **Commitment Scheme Audit** - Confirm commitment generation is cryptographically secure
- [ ] **Merkle Tree Implementation** - Verify tree depth and insertion logic
- [ ] **Groth16 Verification** - Confirm on-chain proof verification correctness

### Smart Contract Security
- [ ] **Reentrancy Protection** - All external calls protected
- [ ] **Integer Overflow/Underflow** - Use checked math operations
- [ ] **Access Control** - Admin functions properly restricted
- [ ] **Pause Mechanism** - Emergency pause functionality tested
- [ ] **Upgrade Path** - Define upgrade process (if any)
- [ ] **State Machine Integrity** - All state transitions validated
- [ ] **Event Emission** - All critical operations emit events

### Key Management
- [ ] **Admin Key Generation** - Secure key generation process
- [ ] **Multi-Signature Setup** - Admin functions behind multi-sig
- [ ] **Key Backup** - Secure backup of all critical keys
- [ ] **Key Rotation Plan** - Document key rotation procedures

---

## 🔍 Audit Requirements

### Pre-Launch Audits
- [ ] **Circuit Audit** - Professional ZK circuit audit completed
- [ ] **Contract Audit** - Professional smart contract audit completed
- [ ] **Integration Audit** - End-to-end flow audit completed
- [ ] **Cryptography Review** - Academic/expert review of cryptographic choices

### Audit Reports
- [ ] Store all audit reports in `docs/audits/`
- [ ] Address all critical findings
- [ ] Address all high-priority findings
- [ ] Document medium/low findings with risk acceptance

---

## 🧪 Testing Requirements

### Unit Tests
- [ ] **Circuit Tests** - 100% coverage of circuit logic
- [ ] Commitment circuit edge cases (zero, max values)
- [ ] Withdrawal circuit all branches
- [ ] Merkle tree operations
- [ ] **Contract Tests** - 100% coverage of contract functions
- [ ] Deposit flow
- [ ] Withdraw flow
- [ ] Admin functions
- [ ] Error handling
- [ ] **SDK Tests** - Client library coverage
- [ ] **Frontend Tests** - UI component coverage

### Integration Tests
- [ ] **End-to-End Deposit** - User can deposit and see balance
- [ ] **End-to-End Withdraw** - User can withdraw to new address
- [ ] **Multi-User Scenarios** - Concurrent deposits/withdraws
- [ ] **Edge Cases** - Empty pool, full tree, gas limits

### Testnet Validation
- [ ] **Stellar Testnet Deployment** - Contract deployed to testnet
- [ ] **Full Flow Testing** - All user flows tested on testnet
- [ ] **Load Testing** - Simulate high transaction volume
- [ ] **Failure Recovery** - Test failure scenarios

### Security Testing
- [ ] **Fuzz Testing** - Fuzz inputs to circuits and contracts
- [ ] **Economic Attacks** - Test withdrawal race conditions
- [ ] **Front-Running Analysis** - Assess front-running risks

---

## 📦 Deployment Procedures

### Pre-Deployment
- [ ] **Contract Bytecode Frozen** - Final bytecode committed
- [ ] **Deployment Scripts Tested** - Scripts work on testnet
- [ ] **Deployment Keys Ready** - Secure deployment keys prepared
- [ ] **Network Configuration** - Correct Stellar network config

### Deployment Steps
1. [ ] **Deploy Privacy Pool Contract** - Record contract ID
2. [ ] **Initialize Contract** - Set admin, denominations, tree depth
3. [ ] **Verify Deployment** - Confirm contract state
4. [ ] **Transfer Admin to Multi-Sig** - Move admin to secure multi-sig
5. [ ] **Deploy SDK** - Publish npm package
6. [ ] **Deploy Frontend** - Deploy web application

### Post-Deployment
- [ ] **Verify Contract on Explorer** - Confirm verified source
- [ ] **Test Live Deposit** - Small test deposit
- [ ] **Test Live Withdraw** - Small test withdraw
- [ ] **Monitor Events** - Confirm event emission
- [ ] **Document Deployment** - Record all addresses and tx hashes

---

## 🔄 Rollback Plans

### Contract Rollback
- [ ] **Pause Capability** - Document how to pause contract
- [ ] **Emergency Withdrawal** - Document emergency fund recovery
- [ ] **Migration Path** - Plan for migrating to new contract if needed

### Frontend/SDK Rollback
- [ ] **Version Pinning** - Users can use previous versions
- [ ] **Rollback Procedure** - Document how to revert deployments

### Communication During Rollback
- [ ] **Status Page** - Where to check system status
- [ ] **Notification Channels** - Twitter, Discord, GitHub
- [ ] **User Communication** - Template messages for incidents

---

## 📢 Communication Strategy

### Pre-Launch
- [ ] **Announcement Draft** - Prepare launch announcement
- [ ] **Blog Post** - Technical blog post explaining the system
- [ ] **Documentation** - Complete user documentation
- [ ] **FAQ** - Anticipated questions answered

### Launch Day
- [ ] **Social Media Posts** - Twitter, Discord announcements
- [ ] **Stellar Community** - Post in Stellar community channels
- [ ] **Press Release** - If applicable

### Post-Launch
- [ ] **Monitoring Dashboard** - Public or team-facing monitoring
- [ ] **Support Channels** - Discord/forum for user support
- [ ] **Issue Tracking** - GitHub issues for bugs/feedback

---

## 📋 Final Pre-Launch Checklist

### 24 Hours Before Launch
- [ ] All audits complete and findings addressed
- [ ] All tests passing on testnet
- [ ] Deployment scripts tested
- [ ] Team briefed on launch procedures
- [ ] Communication materials ready

### Launch Day
- [ ] Final team sync
- [ ] Deploy contracts
- [ ] Verify deployment
- [ ] Test live transactions
- [ ] Publish announcement
- [ ] Monitor for issues

### 24 Hours After Launch
- [ ] Monitor system health
- [ ] Address any user issues
- [ ] Document any incidents
- [ ] Plan next steps

---

## 🔗 Related Documents

- [`CONTRIBUTING.md`](../CONTRIBUTING.md) - Contribution guidelines
- [`README.md`](../README.md) - Project overview
- [`contracts/privacy_pool/ARCHITECTURE.md`](../contracts/privacy_pool/ARCHITECTURE.md) - Contract architecture
- [`docs/threat-model.md`](threat-model.md) - Threat model analysis

---

## 📞 Emergency Contacts

| Role | Contact |
|------|---------|
| Technical Lead | [TBD] |
| Security Lead | [TBD] |
| Operations | [TBD] |

---

*This checklist is a living document. Update as requirements evolve.*

*Last reviewed: 2026-03-25*