Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
284 changes: 284 additions & 0 deletions MAINNET_LAUNCH_CHECKLIST.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,284 @@
# 🚀 PrivacyLayer Mainnet Launch Checklist

## Overview

This checklist ensures PrivacyLayer is fully prepared for mainnet launch, covering security, testing, deployment, and communication requirements.

---

## Phase 1: Security Readiness

### 1.1 Smart Contract Security

- [ ] **Security Audit Completed**
- [ ] At least 2 independent audits from reputable firms
- [ ] All critical/high findings resolved
- [ ] Audit reports published publicly
- [ ] Re-audit completed for any significant changes

- [ ] **Code Quality**
- [ ] 100% test coverage for critical paths
- [ ] All tests passing on latest commit
- [ ] No compiler warnings
- [ ] Gas optimization completed
- [ ] Reentrancy guards implemented where needed

- [ ] **Access Control**
- [ ] Multi-sig wallet configured for admin functions
- [ ] Role-based permissions documented
- [ ] Emergency pause mechanism tested
- [ ] Timelock configured for sensitive operations

### 1.2 Circuit Security (ZK Proofs)

- [ ] **Circuit Audit**
- [ ] Independent circuit audit completed
- [ ] All constraint warnings resolved
- [ ] Edge cases tested (empty inputs, max values, etc.)
- [ ] Proof generation time within acceptable limits

- [ ] **Trusted Setup**
- [ ] MPC ceremony completed (if applicable)
- [ ] Setup artifacts published and verifiable
- [ ] Phase 2 ceremony documented

### 1.3 Infrastructure Security

- [ ] **Node Security**
- [ ] DDoS protection configured
- [ ] Rate limiting implemented
- [ ] SSL/TLS certificates valid and auto-renewing
- [ ] Firewall rules reviewed and hardened

- [ ] **Key Management**
- [ ] Private keys stored in HSM or secure vault
- [ ] Key rotation procedure documented
- [ ] Backup keys securely stored offline
- [ ] No hardcoded secrets in codebase

---

## Phase 2: Testing Requirements

### 2.1 Functional Testing

- [ ] **Unit Tests**
- [ ] All contracts have unit tests
- [ ] All circuits have unit tests
- [ ] Test coverage report: ≥95%
- [ ] Tests run in CI/CD pipeline

- [ ] **Integration Tests**
- [ ] End-to-end flow tested (deposit → prove → withdraw)
- [ ] Cross-chain bridge tested (if applicable)
- [ ] Frontend ↔ Contract integration verified
- [ ] API endpoints tested

- [ ] **Testnet Deployment**
- [ ] Deployed on testnet for ≥4 weeks
- [ ] No critical bugs discovered in final 2 weeks
- [ ] Real users tested core flows
- [ ] Bug bounty program active

### 2.2 Performance Testing

- [ ] **Load Testing**
- [ ] System handles expected TPS (transactions per second)
- [ ] Proof generation time < [X] seconds
- [ ] Proof verification time < [Y] seconds
- [ ] Database queries optimized

- [ ] **Stress Testing**
- [ ] System behavior under 10x expected load documented
- [ ] Graceful degradation verified
- [ ] Recovery procedure tested

### 2.3 User Acceptance Testing

- [ ] **Beta Program**
- [ ] ≥100 beta users completed onboarding
- [ ] User feedback incorporated
- [ ] UX issues resolved
- [ ] Documentation validated by beta users

---

## Phase 3: Deployment Procedures

### 3.1 Pre-Deployment

- [ ] **Environment Setup**
- [ ] Production environment isolated from staging
- [ ] All environment variables documented
- [ ] Secrets loaded from secure vault
- [ ] Monitoring and alerting configured

- [ ] **Contract Deployment**
- [ ] Deployment scripts tested on testnet
- [ ] Deployment runbook created
- [ ] Rollback procedure documented
- [ ] Contract verification on block explorer

### 3.2 Deployment Day

- [ ] **Go/No-Go Decision**
- [ ] All checklist items completed
- [ ] Core team available for launch
- [ ] Communication channels ready (Discord, Twitter, etc.)
- [ ] Final security scan completed

- [ ] **Deployment Steps**
1. Deploy contracts to mainnet
2. Verify contracts on block explorer
3. Initialize contracts with correct parameters
4. Transfer ownership to multi-sig
5. Deploy frontend to production
6. Update DNS records
7. Enable monitoring alerts
8. Announce launch

### 3.3 Post-Deployment

- [ ] **Verification**
- [ ] All contracts respond correctly
- [ ] Frontend connects to mainnet
- [ ] First transaction successful
- [ ] Monitoring dashboards show healthy status

- [ ] **Documentation**
- [ ] Deployment report created
- [ ] Contract addresses published
- [ ] Known issues documented
- [ ] Support channels staffed

---

## Phase 4: Rollback Plans

### 4.1 Emergency Scenarios

- [ ] **Critical Bug Discovered**
- [ ] Emergency pause mechanism tested
- [ ] Team can pause contracts within 15 minutes
- [ ] Communication template prepared
- [ ] Hotfix deployment procedure documented

- [ ] **Exploit Detected**
- [ ] Emergency response team identified
- [ ] Contact list for exchanges/bridges ready
- [ ] Forensic analysis procedure documented
- [ ] User communication plan prepared

### 4.2 Rollback Procedures

- [ ] **Contract Rollback**
- [ ] Upgrade mechanism tested (if proxy pattern used)
- [ ] Migration procedure for user funds documented
- [ ] Rollback decision criteria defined

- [ ] **Frontend Rollback**
- [ ] Previous version tagged and deployable
- [ ] DNS rollback procedure tested
- [ ] CDN cache purge procedure documented

---

## Phase 5: Communication Strategy

### 5.1 Pre-Launch

- [ ] **Announcement Plan**
- [ ] Blog post drafted
- [ ] Social media posts scheduled
- [ ] Press release prepared (if applicable)
- [ ] Community AMAs scheduled

- [ ] **Documentation**
- [ ] User guide published
- [ ] Developer documentation complete
- [ ] FAQ page created
- [ ] Video tutorials recorded

### 5.2 Launch Day

- [ ] **Communication Channels**
- [ ] Twitter/X announcement posted
- [ ] Discord announcement made
- [ ] Email newsletter sent
- [ ] Blog post published

- [ ] **Support Readiness**
- [ ] Support team briefed
- [ ] Common issues FAQ prepared
- [ ] Escalation procedure defined
- [ ] Response time SLA: <1 hour

### 5.3 Post-Launch

- [ ] **Follow-Up**
- [ ] Launch metrics published (24h, 7d, 30d)
- [ ] User feedback collected
- [ ] Post-mortem scheduled (regardless of success)
- [ ] Thank you message to community

---

## Phase 6: Compliance & Legal

### 6.1 Regulatory Compliance

- [ ] **Legal Review**
- [ ] Token classification reviewed by legal counsel
- [ ] Terms of Service published
- [ ] Privacy Policy published
- [ ] KYC/AML requirements assessed (if applicable)

- [ ] **Geographic Restrictions**
- [ ] Restricted countries identified
- [ ] Geo-blocking implemented (if required)
- [ ] Compliance documentation prepared

---

## Sign-Off

| Role | Name | Date | Status |
|------|------|------|--------|
| **Technical Lead** | | | ☐ Approved |
| **Security Lead** | | | ☐ Approved |
| **Product Lead** | | | ☐ Approved |
| **Legal Counsel** | | | ☐ Approved |
| **CEO/Founder** | | | ☐ Approved |

---

## Appendix

### A. Emergency Contacts

| Role | Name | Contact |
|------|------|---------|
| On-Call Engineer | | |
| Security Lead | | |
| Legal Counsel | | |
| CEO/Founder | | |

### B. External Resources

- **Audit Firms:** [List of audited firms and report links]
- **Block Explorers:** [Etherscan, etc.]
- **Monitoring:** [Dashboard links]
- **Status Page:** [status.privacylayer.io]

### C. Revision History

| Version | Date | Author | Changes |
|---------|------|--------|---------|
| 1.0 | | | Initial draft |

---

**Last Updated:** [Date]
**Next Review:** [Date + 30 days]

**Contact:** security@privacylayer.io for questions or concerns.
Loading