Skip to content

replaced :return: with :rtype: #160

replaced :return: with :rtype:

replaced :return: with :rtype: #160

Triggered via push March 28, 2026 04:40
Status Failure
Total duration 2m 56s
Artifacts

e2e-master.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
The operation was canceled.