Skip to content

removed the two tests temporarily, will add back later #277

removed the two tests temporarily, will add back later

removed the two tests temporarily, will add back later #277

Triggered via push March 27, 2026 19:56
Status Failure
Total duration 2m 19s
Artifacts

test.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

13 errors
build (3.11)
Process completed with exit code 1.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.13)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_11" failed
build (3.8)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.14)
The strategy configuration was canceled because "build._3_11" failed
build (3.14)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.9, coverage)
The strategy configuration was canceled because "build._3_11" failed
build (3.9, coverage)
The operation was canceled.