Skip to content

Update version to 1.1.2 and improve crypt module fallback handling #272

Update version to 1.1.2 and improve crypt module fallback handling

Update version to 1.1.2 and improve crypt module fallback handling #272

Triggered via pull request August 18, 2025 10:58
@sharmagotsharmagot
synchronize #571
1.1.2
Status Failure
Total duration 35s
Artifacts

ci.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (3.9)
Process completed with exit code 125.
build (pypy3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
A task was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed