-
Notifications
You must be signed in to change notification settings - Fork 2
Open
Description
Summary
Generate as many usable kernel codes as possible, add measurement metrics for comparison with OpenCGRA, implement a case study, and complete the paper (full draft by 2025-11-03; final by 2025-11-17). Focus on experimental data quality and the case study.
Timeline & Milestones
2025-11-03 — Full Draft v1 (complete narrative; preliminary figures/tables OK)
2025-11-17 — Final Submission (camera-ready text, finalized figures/tables, artifact links)
TODO
Benchmarks (CGRA-benchmark)
- Run all testbenches with current toolchain
- Triage ⇒ ✅ usable /
⚠️ minor fix / ❌ unsupported - (record reason codes: missing op, routing fail, II constraint, timeout, etc.)
- Add promising new testbenches if feasible (with brief justification)
Metrics & Evaluation (vs. OpenCGRA)
- Define metrics: compile success rate, II/throughput, resource/utilization, routing success, compile time (optional: runtime/energy proxies)
- Implement measurement harness; export CSV/JSON; reproducible script
- Generate comparative tables/plots
Case Study
- Specify setup (arch, params, datasets), methodology, and hypotheses
- Run, collect results, analyze, and draft discussion
Writing
- Review previous three sections for clarity/consistency (Next Monday)
- Replace with ISCA template
- Assemble full draft (includes placeholders for figures/tables as needed)
- Integrate results & figures; finalize narrative
Metadata
Metadata
Assignees
Labels
No labels