Skip to content
This repository was archived by the owner on Jul 11, 2020. It is now read-only.
This repository was archived by the owner on Jul 11, 2020. It is now read-only.

Requirements modification after sequences has been added #4

@cfsottile

Description

@cfsottile

Say I have these requirements

A: 1, 3, 1, 2
B: 2, 4, 3, 4
C: 2, 3, 2

and I'm writing sequences. I'm half the way through:

A requires 2 pages
B requires 1 page
C requires 1 page
B requires 2 pages

As for now, I have covered these requirements:

  • A: _1, _3, 1, 2
  • B: _2, _4, _3_, 4
  • C: _2_, 3, 2

If i want to make a changes:

  • If I modify those requirements which have been covered by sequences, it would alter the last ones and introduced changes can be unintuitive. Maybe I shouldn't be able to do it, and be forced to delete a sequence to alter its related requirements.
  • If I modify requirements which haven't been covered by sequences, I won't get into troubles so I should be able to.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions