Skip to content

Latest commit

 

History

History
46 lines (39 loc) · 2.23 KB

File metadata and controls

46 lines (39 loc) · 2.23 KB

Template Quality Checklist

Reference table for validating AAR, PIR, and Logbook entries.

Completeness Matrix

Criteria AAR PIR Logbook Notes
Metadata
Date + identifier Required Required Required Sequential (AAR-NNN, PIR-NNN)
Phase / milestone Required Required Required Tracks roadmap position
Duration Required Required Required Wall-clock or time range
Agents + tokens Required In token cost section Required Computational investment
Health (RAG) Required N/A (has severity) Required GREEN / AMBER / RED
Severity (P0-P3) N/A Required N/A Define per-project
Content
Objective / summary Required Required (write last) Required (write first)
Chronological trace Required Required (timeline) Required (work done) Facts before analysis
Variance / root cause Required (planned vs actual) Required (Five Whys) N/A AAR = variance, PIR = root cause
WIP tracking N/A N/A Required ✅/❌/⏸️ status
Safety
Blast radius N/A Required N/A Direct → adjacent → downstream → potential
Prompt forensics N/A Required (if agent-involved) N/A Was the prompt ambiguous?
Continuity
Action items (owned, dated) Required Required N/A (use handoff)
Handoff notes N/A N/A Required For zero-context agent
Read order N/A N/A Required "Start here" pointers
Lessons learned Required (Sustain/Improve/Stop) Required N/A
Token economics Required (investment) Required (waste) Optional

Triggers

Template When to Write
Logbook Every session (non-negotiable)
AAR After milestone, significant session, plan divergence
PIR Trust-breaking event, deployed wrong, bug surviving >1 session
ADR Decision meeting ≥2 of: irreversible, cross-cutting, non-obvious trade-off, incident-driven

RAG Definitions

Status Meaning Action
🟢 GREEN On track Continue
🟡 AMBER Minor concerns Monitor
🔴 RED Blocked or trust-eroding Stop and address