refactor(lint): fix issue reported by linter #457
run-tests.yml
on: push
Matrix: Integration and Unit tests
Acceptance tests
2m 4s
Tests
0s
Annotations
8 errors
|
Integration and Unit tests (3.9.21)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.9.21)
The operation was canceled.
|
|
Integration and Unit tests (3.10.16)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.10.16)
The operation was canceled.
|
|
Integration and Unit tests (3.11.11)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.11.11)
The operation was canceled.
|
|
Integration and Unit tests (3.12.9)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.12.9)
The operation was canceled.
|