Tests pt.4 Final-2 #430
run-tests.yml
on: push
Matrix: Integration and Unit tests
Acceptance tests
2m 3s
Tests
Annotations
7 errors
|
Integration and Unit tests (3.9.21)
The operation was canceled.
|
|
Integration and Unit tests (3.9.21)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.10.16)
The operation was canceled.
|
|
Integration and Unit tests (3.10.16)
The job has exceeded the maximum execution time of 5m0s
|
|
Integration and Unit tests (3.11.11)
Process completed with exit code 1.
|
|
Integration and Unit tests (3.11.11)
The run was canceled by @github-actions[bot].
|
|
Tests
The run was canceled by @github-actions[bot].
|