Skip to content

v2.0.0: Refactor for sample-wise parameterisation #583

v2.0.0: Refactor for sample-wise parameterisation

v2.0.0: Refactor for sample-wise parameterisation #583

Triggered via pull request February 13, 2026 09:15
Status Failure
Total duration 35s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

31 errors
Run pipeline with test data (25.04.0 | ont_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (25.04.0 | hifi_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifi_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (25.04.0 | hifiont_flye_on_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifiont_flye_on_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | hifiont_flye_on_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifiont_hifiasm_on_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | hifiont_hifiasm_on_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifiont_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifiont_hifiasm | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | hifi_flye | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | hifi_flye | docker)
The operation was canceled.
Run pipeline with test data (25.04.0 | ont_flye | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | ont_flye | docker)
The operation was canceled.
Run pipeline with test data (25.04.0 | hifi_flye | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (25.04.0 | hifi_flye | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | ont_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | ont_hifiasm | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | ont_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | hifiont_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | hifiont_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | ont_flye | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | ont_flye | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | ont_flye | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | hifi_hifiasm | docker)
The strategy configuration was canceled because "test._25_04_0_ont_hifiasm_dock" failed
Run pipeline with test data (latest-everything | hifi_hifiasm | docker)
Process completed with exit code 1.