Skip to content

merge template 3.4.1 #573

merge template 3.4.1

merge template 3.4.1 #573

Triggered via push October 24, 2025 08:41
Status Failure
Total duration 41s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

29 errors
Run pipeline with test data (24.10.5 | hifiont_flye_on_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (24.10.5 | hifi_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | ont_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | ont_hifiasm | docker)
The operation was canceled.
Run pipeline with test data (24.10.5 | ont_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | ont_hifiasm | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | hifiont_hifiasm_on_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | hifiont_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | hifiont_hifiasm | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | hifi_flye | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | hifi_flye | docker)
The operation was canceled.
Run pipeline with test data (24.10.5 | hifi_flye | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | hifi_flye | docker)
The operation was canceled.
Run pipeline with test data (24.10.5 | hifiont_hifiasm_on_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | ont_flye | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (24.10.5 | ont_flye | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | hifiont_flye_on_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | ont_flye | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | ont_flye | docker)
The operation was canceled.
Run pipeline with test data (latest-everything | ont_flye | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | hifi_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | hifi_hifiasm | docker)
Process completed with exit code 1.
Run pipeline with test data (latest-everything | hifiont_hifiasm | docker)
The strategy configuration was canceled because "test._24_10_5_hifi_hifiasm_doc" failed
Run pipeline with test data (latest-everything | hifiont_hifiasm | docker)
Process completed with exit code 1.