Bump golang.org/x/sync from 0.5.0 to 0.13.0 #320
Annotations
3 errors
|
Build & Test (stable, ubuntu-latest)
Process completed with exit code 1.
|
|
Build & Test (stable, macos-latest)
The strategy configuration was canceled because "test.stable_ubuntu-latest" failed
|
|
Build & Test (stable, windows-latest)
The strategy configuration was canceled because "test.stable_ubuntu-latest" failed
|