fix(connect): strictly check resource when required. Strictly ensure destroy confirmation is true
#55
Annotations
6 errors
|
test (2.x)
Process completed with exit code 1.
|
|
test-node (18.x, 2.x)
Process completed with exit code 2.
|
|
test-node (22.x, 2.x)
The job was canceled because "_18_x_2_x" failed.
|
|
test-node (22.x, 2.x)
The operation was canceled.
|
|
test-node (20.x, 2.x)
The job was canceled because "_18_x_2_x" failed.
|
|
test-node (20.x, 2.x)
The operation was canceled.
|