Skip to content
This repository was archived by the owner on Jan 16, 2025. It is now read-only.
This repository was archived by the owner on Jan 16, 2025. It is now read-only.

RFC: Reorganizing the issues --> PR flow for subsequent release of gluster-colonizer #24

@sankarshanmukhopadhyay

Description

@sankarshanmukhopadhyay

For the next upcoming release of gluster-colonizer, I have a few suggestions and putting them out here for comments.

  • it would be good to use the "Projects" construct available to create a release number

  • each of the features which make up the release will be an issue under the respective swimlane

  • only when all the issues have been closed; because the PRs associated with them have been merged into a release branch, will the full release build be available

I propose this structure to ensure that a release is built through a series of PRs which address specific issues (which could be features or, bugs). A release has the full set of fixes and thus is ready to undergo testing prior to general availability. Any interim release, if at all, will have to be built per-PR or, similar so that, if required, a snap/interim build will contain all the PRs prior to that. A snap/interim is not a full release. Adoption of this or, a variant of this will also ensure that packaging guidelines are easily adhered to and it would facilitate tracking/auditing of all the content in a particular release.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions