chore(release): bump crate versions on main #174

chore(release): bump crate versions on main

chore(release): bump crate versions on main #174

Triggered via pull request March 4, 2026 02:50
Status Failure
Total duration 39s
Artifacts

CI.yml

on: pull_request
Matrix: linux
Matrix: macos
Matrix: musllinux
Matrix: windows
man-generation
9s
man-generation
Fit to window
Zoom out
Zoom in

Annotations

18 errors
linux (ubuntu-24.04, x86_64)
Process completed with exit code 101.
man-generation
Process completed with exit code 101.
linux (ubuntu-24.04, aarch64)
The strategy configuration was canceled because "linux.ubuntu-24_04_x86_64" failed
linux (ubuntu-24.04, aarch64)
Process completed with exit code 101.
musllinux (ubuntu-24.04, x86_64)
Process completed with exit code 101.
musllinux (ubuntu-24.04, aarch64)
The strategy configuration was canceled because "musllinux.ubuntu-24_04_x86_64" failed
musllinux (ubuntu-24.04, aarch64)
Process completed with exit code 101.
linux (ubuntu-24.04, armv7)
The strategy configuration was canceled because "linux.ubuntu-24_04_x86_64" failed
linux (ubuntu-24.04, armv7)
Process completed with exit code 101.
linux (ubuntu-24.04, ppc64le)
The strategy configuration was canceled because "linux.ubuntu-24_04_x86_64" failed
linux (ubuntu-24.04, ppc64le)
The operation was canceled.
musllinux (ubuntu-24.04, armv7)
The strategy configuration was canceled because "musllinux.ubuntu-24_04_x86_64" failed
musllinux (ubuntu-24.04, armv7)
The operation was canceled.
linux (ubuntu-24.04, s390x)
The strategy configuration was canceled because "linux.ubuntu-24_04_x86_64" failed
linux (ubuntu-24.04, s390x)
The operation was canceled.
macos (macos-14, aarch64)
Process completed with exit code 101.
windows (windows-latest, x64)
Process completed with exit code 1.
CI
Process completed with exit code 1.