-
Notifications
You must be signed in to change notification settings - Fork 0
Open
Labels
poc-v1Proof-of-concept V1 tracking workProof-of-concept V1 tracking workpriority/p2Useful later workUseful later worktaskTracked implementation taskTracked implementation tasktestingTesting and verification workTesting and verification work
Milestone
Description
Imported from docs/milestones/proof-of-concept-1/poc_v1_task_breakdown.md.
Phase: P7 End-To-End Proof
Source task: T7.3
Purpose:
- ensure the polished demo path is repeatable outside automated tests
Output:
- short runbook for starting Daneel and demonstrating the first graph
Tests:
- manual check: local startup instructions are accurate
- manual check: expected mock or real gateway fixture produces the documented dashboard state
Suggested Execution Order
- T0.1
- T0.2
- T0.3
- T0.4
- T1.1
- T1.4
- T2.1
- T2.2
- T2.3
- T3.1
- T3.2
- T3.3
- T3.4
- T3.5
- T3.6
- T3.7
- T4.1
- T4.2
- T4.3
- T1.2
- T1.3
- T5.1
- T5.2
- T5.3
- T5.4
- T5.5
- T6.1
- T6.2
- T6.3
- T7.1
- T7.2
- T7.3
Smallest Useful Vertical Slice
If we want the absolute minimum path before the full polish pass:
- T0.1
- T0.2
- T0.3
- T0.4
- T1.1
- T1.4
- T2.1
- T2.2
- T3.1
- T3.2
- T3.3
- T3.4
- T3.5
- T3.6
- T4.1
- T4.3
- T5.1
- T5.2
- T5.3
- T5.4
- T6.2
POC Success Demo Script
At the end of the first vertical slice we should be able to demo:
- Start Daneel locally.
- Open the dashboard in the browser.
- Show that gateway status loads from OpenClaw.
- Show that agents are fetched through the adapter.
- Show the graph of agents and relationships.
- Trigger a manual refresh and show updated state.
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
poc-v1Proof-of-concept V1 tracking workProof-of-concept V1 tracking workpriority/p2Useful later workUseful later worktaskTracked implementation taskTracked implementation tasktestingTesting and verification workTesting and verification work
Projects
Status
Backlog