Skip to content

chore(deps): update dependency node to v24 #775

chore(deps): update dependency node to v24

chore(deps): update dependency node to v24 #775

Triggered via push October 28, 2025 20:48
Status Failure
Total duration 28s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test (ubuntu-latest, 20)
Process completed with exit code 127.
test (macOS-latest, 22)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (windows-latest, 24)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (macOS-latest, 24)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (ubuntu-latest, 24)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (ubuntu-latest, 24)
The operation was canceled.
test (windows-latest, 22)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (windows-latest, 22)
The operation was canceled.
test (ubuntu-latest, 22)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (ubuntu-latest, 22)
The operation was canceled.
test (windows-latest, 20)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (windows-latest, 20)
The operation was canceled.
test (macOS-latest, 20)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (macOS-latest, 20)
The operation was canceled.