From ADR-055 Phase 6. - [x] Postgres backend with envelope encryption for key material - [x] KMS integration (AWS KMS, HashiCorp Vault) for root key protection - [x] Horizontal scaling with leader election per formation → #21 (ADR: defer implementation, PR #46) - [x] Formation sharding across gateway replicas → #22 (folded into #21) - [x] Load testing: concurrent formations, CDC throughput, enrollment rate → #23 (PR #25) - [x] Integration test suite: multi-org isolation, CDC end-to-end, OIDC flow → #24 - [x] Org data isolation verification (no cross-tenant leaks) → #24
From ADR-055 Phase 6.