Skip to content

Latest commit

 

History

History
102 lines (78 loc) · 3.55 KB

File metadata and controls

102 lines (78 loc) · 3.55 KB

Phase 4 Production GA - Agent Status Tracker

Phase: 4 - Production GA Status: IN PROGRESS Started: 2026-02-08 Target Completion: 2026-02-08


Agent Deployment Status

Agent Task Status Deliverables Verification
AGENT_1 Migration Scripts 🔄 IN PROGRESS migration-scripts.ts, types.ts, validators.ts Compilation, Tests
AGENT_2 Canary Deployment 🔄 IN PROGRESS canary-deployment.ts, canary-config.ts, canary-metrics.ts Compilation, Config
AGENT_3 Rollout Orchestrator 🔄 IN PROGRESS rollout-orchestrator.ts, rollout-state.ts, gate-criteria.ts State Machine
AGENT_4 Rollback System 🔄 IN PROGRESS rollback-system.ts, rollback-procedures.ts, data-consistency.ts <15min Rollback
AGENT_16 Production Monitoring 🔄 IN PROGRESS production-metrics.ts, alert-correlation.ts, incident-response.ts Metrics, Alerts
AGENT_17 Grafana Dashboards 🔄 IN PROGRESS vm-performance.json, cost-attribution.json, migration-progress.json Dashboards
AGENT_25 1000VM Load Test 🔄 IN PROGRESS 1000vm-stress-test.ts, load-generator.ts, metrics-collector.ts Test Execution
AGENT_26 Chaos Engineering 🔄 IN PROGRESS chaos-tests.ts, vm-termination.ts, network-partition.ts Chaos Tests
AGENT_27 Security Audit 🔄 IN PROGRESS penetration-test-report.md, compliance-checklist.md SOC2 Compliance
AGENT_28 API Documentation 🔄 IN PROGRESS runtime-provider-api.md, configuration-reference.md, examples.md Documentation
AGENT_29 Migration Guide 🔄 IN PROGRESS team-migration-guide.md, troubleshooting.md, best-practices.md Guides
AGENT_30 Operational Runbooks 🔄 IN PROGRESS incident-response.md, common-issues.md, escalation-procedures.md Runbooks
ORCHESTRATOR GA Release 🔄 IN PROGRESS RELEASE_NOTES.md, stakeholder-notification.md, status-page-update.md Release

Phase 4 Exit Criteria

  • 100% migration complete
  • 99.9% uptime maintained
  • 1000VM test passed
  • All docs published
  • GA ready

Critical Requirements

From PRD-003 Section 3.2:

  • Zero downtime migration
  • <100ms boot time P95
  • 1000+ concurrent agents
  • SOC2/ISO27001 compliance
  • Rollback capability <15min

From SPEC-002 Section 4.4:

  • RuntimeProvider abstraction
  • Canary deployment (1%→5%→25%→100%)
  • Automated rollback triggers
  • Production monitoring
  • Chaos engineering validation

File Locations

Source Code

  • /src/migration/ - Migration scripts and systems
  • /src/ - Core implementation

Tests

  • /tests/migration/ - Migration tests
  • /tests/canary/ - Canary deployment tests
  • /tests/rollback/ - Rollback tests
  • /tests/load/ - Load tests
  • /tests/chaos/ - Chaos engineering tests

Documentation

  • /docs/api/ - API documentation
  • /docs/guides/ - Migration guides
  • /docs/runbooks/ - Operational runbooks
  • /docs/ga/ - GA release materials

Monitoring

  • /monitoring/ - Monitoring configuration
  • /monitoring/grafana/ - Dashboard definitions

Security

  • /security/ - Security audit reports

Next Steps

  1. Monitor agent progress
  2. Verify deliverables as agents complete
  3. Run integration tests
  4. Execute 1000VM load test
  5. Final security sign-off
  6. GA announcement

Notes

  • All 13 agents dispatched in parallel
  • Working directory: /Users/jasontang/clawd/projects/godel
  • Each agent has specific deliverables and verification criteria
  • Anti-stub protocol enforced for all implementations