Skip to content

[repo-status] Daily Status Report β€” March 20, 2026 🎬 #8

@github-actions

Description

@github-actions

πŸ“‘ StreamCaster Daily Status β€” March 20, 2026

Good morning! Here's your daily snapshot of StreamCaster-android activity and progress. πŸš€


πŸ”₯ Hot Right Now β€” Action Needed

πŸ”΄ PR #5 β€” Critical Bug Fix Awaiting Review

Fix: energy-saving mode stops RTMP stream Β· Draft Β· Opened 2026-03-18

This is an important fix! Enabling the energy-saving preview overlay was breaking the live RTMP stream. Root cause: any call to stopPreview() while streaming closes the camera capture session, starving the encoder.

The fix is elegant β€” energy-saving is implemented as a pure UI overlay (a near-black Box composited on top of the SurfaceView). The CameraPreview stays in the Compose composition at all times, so the encoder and camera session are never disrupted. Toggle on/off freely during a live stream. ✨

πŸ‘‰ Action: Review and merge PR #5 to ship this critical fix.

🟑 PR #6 β€” Cleanup Candidate

No changes: non-actionable issue Β· Draft Β· Opened 2026-03-18

This draft PR was generated in response to an off-topic query (personal calendar). No code was changed. Safe to close.

πŸ‘‰ Action: Close PR #6 β€” no code changes, no value to ship.


βœ… Recent Wins

Date What Happened
2026-03-18 βœ… Daily status workflow merged (PR #1) β€” you're reading the result!
2026-03-15 πŸ§ͺ 150 unit tests passing β€” QA acceptance suite complete (T-035)
2026-03-15 πŸ“¦ APK release GitHub Actions workflow added with tag-based triggers
2026-03-15 🎨 Control panel icons refactored for cleaner streaming UI
2026-03-15 πŸ”Œ OpenGlView integrated for camera preview; default endpoint profile seeding added
2026-03-15 πŸ“‹ Sideload instructions documented

πŸ“Š Project Health

Metric Status
Open Issues 0 🟒
Open PRs 2 (both draft)
Unit Tests 150 passing βœ…
Build Flavors foss + gms
FOSS GMS check Workflow in place βœ…

πŸ—ΊοΈ Implementation Plan Progress

Based on the Implementation Plan, the project is progressing through its phased delivery:

  • Phase 1 (Core Streaming MVP) β€” Active, strong test coverage in place πŸ”¨
  • Phase 2 (Settings & Configuration) β€” Architecture defined, data contracts locked ✍️
  • Phase 3 (Resilience & Polish) β€” Thermal monitoring, ABR, reconnect logic designed πŸ“
  • Phase 4+ β€” Out of scope for now

Key architecture components already specced:

  • StreamingService (FGS, source of truth)
  • EncoderController (Mutex-serialized quality changes)
  • ConnectionManager (exponential backoff reconnect)
  • CredentialSanitizer (log/ACRA redaction)
  • EncryptedSharedPreferences for all credentials

🎯 Recommended Next Steps

  1. Review & merge PR #5 β€” the energy-saving fix is well-implemented and critical for long streaming sessions
  2. Close PR #6 β€” no changes, no value; keep the PR list clean
  3. Continue Phase 1 implementation tasks β€” the test suite foundation is solid, time to wire up the service layer end-to-end
  4. Add build CI workflow β€” the APK release workflow exists; a PR check workflow (build + unit tests) would catch regressions early
  5. Track remaining WBS items β€” consider opening issues for outstanding implementation plan tasks to improve visibility

Generated automatically by the daily-repo-status workflow Β· πŸ€– GitHub Copilot

Generated by Daily Repo Status Β· β—·

To install this agentic workflow, run

gh aw add githubnext/agentics/workflows/daily-repo-status.md@1199e4a230756fb94a382496a73e689091aa4b6b

Metadata

Metadata

Assignees

No one assigned

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions