-
Notifications
You must be signed in to change notification settings - Fork 0
[repo-status] Daily Status Report β March 20, 2026 π¬Β #8
Description
π‘ StreamCaster Daily Status β March 20, 2026
Good morning! Here's your daily snapshot of StreamCaster-android activity and progress. π
π₯ Hot Right Now β Action Needed
π΄ PR #5 β Critical Bug Fix Awaiting Review
Fix: energy-saving mode stops RTMP stream Β· Draft Β· Opened 2026-03-18
This is an important fix! Enabling the energy-saving preview overlay was breaking the live RTMP stream. Root cause: any call to stopPreview() while streaming closes the camera capture session, starving the encoder.
The fix is elegant β energy-saving is implemented as a pure UI overlay (a near-black Box composited on top of the SurfaceView). The CameraPreview stays in the Compose composition at all times, so the encoder and camera session are never disrupted. Toggle on/off freely during a live stream. β¨
π Action: Review and merge PR
#5to ship this critical fix.
π‘ PR #6 β Cleanup Candidate
No changes: non-actionable issue Β· Draft Β· Opened 2026-03-18
This draft PR was generated in response to an off-topic query (personal calendar). No code was changed. Safe to close.
π Action: Close PR
#6β no code changes, no value to ship.
β Recent Wins
| Date | What Happened |
|---|---|
| 2026-03-18 | β
Daily status workflow merged (PR #1) β you're reading the result! |
| 2026-03-15 | π§ͺ 150 unit tests passing β QA acceptance suite complete (T-035) |
| 2026-03-15 | π¦ APK release GitHub Actions workflow added with tag-based triggers |
| 2026-03-15 | π¨ Control panel icons refactored for cleaner streaming UI |
| 2026-03-15 | π OpenGlView integrated for camera preview; default endpoint profile seeding added |
| 2026-03-15 | π Sideload instructions documented |
π Project Health
| Metric | Status |
|---|---|
| Open Issues | 0 π’ |
| Open PRs | 2 (both draft) |
| Unit Tests | 150 passing β |
| Build Flavors | foss + gms |
| FOSS GMS check | Workflow in place β |
πΊοΈ Implementation Plan Progress
Based on the Implementation Plan, the project is progressing through its phased delivery:
- Phase 1 (Core Streaming MVP) β Active, strong test coverage in place π¨
- Phase 2 (Settings & Configuration) β Architecture defined, data contracts locked βοΈ
- Phase 3 (Resilience & Polish) β Thermal monitoring, ABR, reconnect logic designed π
- Phase 4+ β Out of scope for now
Key architecture components already specced:
StreamingService(FGS, source of truth)EncoderController(Mutex-serialized quality changes)ConnectionManager(exponential backoff reconnect)CredentialSanitizer(log/ACRA redaction)EncryptedSharedPreferencesfor all credentials
π― Recommended Next Steps
- Review & merge PR
#5β the energy-saving fix is well-implemented and critical for long streaming sessions - Close PR
#6β no changes, no value; keep the PR list clean - Continue Phase 1 implementation tasks β the test suite foundation is solid, time to wire up the service layer end-to-end
- Add build CI workflow β the APK release workflow exists; a PR check workflow (build + unit tests) would catch regressions early
- Track remaining WBS items β consider opening issues for outstanding implementation plan tasks to improve visibility
Generated automatically by the daily-repo-status workflow Β· π€ GitHub Copilot
Generated by Daily Repo Status Β· β·
To install this agentic workflow, run
gh aw add githubnext/agentics/workflows/daily-repo-status.md@1199e4a230756fb94a382496a73e689091aa4b6b