-
Notifications
You must be signed in to change notification settings - Fork 0
[repo-status] Daily Repo Status β March 19, 2026Β #7
Copy link
Copy link
Closed as not planned
Labels
Description
π StreamCaster Android β Daily Status Report
Date: March 19, 2026 | Repo: alxayo/StreamCaster-android
π Highlights
- v0.0.1 shipped! First public release landed on March 15 β the foundation is live. π―
- 150 unit tests passing across core modules (T-035 complete) β a solid QA baseline is in place.
- Daily status workflow is live β automated visibility from day one. β
- Energy-saving bug fix in review (PR
#5) β a critical streaming issue was caught and a fix is ready for maintainer eyes.
π Open Pull Requests
| # | Title | Status | Notes |
|---|---|---|---|
#5 |
Fix: energy-saving mode stops RTMP stream | π‘ Draft β awaiting review | Pure UI overlay approach keeps encoder/camera untouched |
#6 |
No changes: non-actionable issue | ποΈ Draft β can be closed | Triaged off-topic issue (calendar query) |
β οΈ PR#5is the priority item: enabling energy-saving was closing the camera capture session and killing the stream. The proposed fix composites a dark overlay in the UI layer without touchingRtmpCamera2β correct architectural approach per the service layer rules. The build couldn't be verified in CI due to a firewall block ondl.google.com; a local build or Actions setup step is needed to confirm compilation.
π¨ Recent Activity (Last 4 Days)
| Date | Change |
|---|---|
| Mar 18 | Merged daily-repo-status agentic workflow (PR #1) |
| Mar 15 | v0.0.1 released β APK published via GitHub Actions |
| Mar 15 | GitHub Actions APK release workflow added & enhanced |
| Mar 15 | T-035 complete: 150 QA acceptance tests passing |
| Mar 15 | OpenGlView integration + default profile seeding |
| Mar 15 | Sideload instructions added (SIDELOAD_INSTRUCTIONS.md) |
| Mar 15 | Material icons dependency + enhanced service logging |
| Mar 15 | Streaming control panel icons refactored |
| Mar 15 | Detailed failure diagnostics added to service and UI |
π Project Health
| Area | Status |
|---|---|
| Build (foss/gms) | β Both flavors compile |
| Unit tests | β 150 tests passing |
| Release pipeline | β GitHub Actions workflow active |
| Security | β No credentials in Intents, EncryptedSharedPreferences in use |
| Open issues | β None |
| Open PRs |
β Actionable Next Steps
- Review & merge PR
#5β energy-saving fix is architecturally sound; verify it compiles locally (./gradlew assembleFossDebug) and merge to unblock the next development cycle. - Close PR
#6β it's a triaged no-op draft and can be cleaned up. - Unblock CI builds β add
dl.google.comto the Copilot coding agent allowlist in repo settings so Gradle can run in CI (needed for future automated PR validation). - Continue Phase 1 tasks β with T-035 done and the core app building, the next highest-value tasks from the WBS are ABR (T-019/T-020), thermal monitoring (T-021), and the endpoint settings screen (T-016).
- Tag daily workflow runs β the status workflow is live; consider labeling generated issues for easy filtering.
Generated automatically by the daily-repo-status workflow. π€
Generated by Daily Repo Status Β· β·
To install this agentic workflow, run
gh aw add githubnext/agentics/workflows/daily-repo-status.md@1199e4a230756fb94a382496a73e689091aa4b6b
Reactions are currently unavailable