Skip to content

[repo-status] Daily Status Report β€” March 23, 2026Β #11

@github-actions

Description

@github-actions

🎬 StreamCaster β€” Daily Status Report

Date: March 23, 2026 | Build flavors: foss + gms | Package: com.port80.app


πŸš€ Recent Activity Highlights

πŸ“¦ Releases

  • v0.0.1 shipped on March 15 β€” first public release! The app builds and installs via sideload (see SIDELOAD_INSTRUCTIONS.md).

πŸ”€ Open Pull Requests (2)

# Title Status Priority
#5 Fix: energy-saving mode stops RTMP stream 🟑 Draft πŸ”΄ Critical
#6 No changes: non-actionable issue 🟑 Draft ⬇️ Low

PR #5 is the most important one to act on β€” it addresses a major regression where activating the energy-saving screen-dimming mode kills the live RTMP stream. The proposed fix is elegant: keep the CameraPreview SurfaceView always in the Compose composition and layer a dark overlay on top, so the encoder never loses its frame source. Ready for review!

πŸ”¨ Recent Commits (last week)

  • βœ… T-035 complete β€” QA acceptance test suite with 150 tests passing (StreamConfig, ABR ladder, media mode transitions, endpoint profiles, camera switcher, battery monitor)
  • βœ… OpenGlView integration + default profile seeding
  • βœ… APK release GitHub Actions workflow (supports input tag)
  • βœ… Failure diagnostics for streaming service and UI
  • βœ… Control panel icon refactor
  • βœ… Material Icons dependency added
  • βœ… Daily repo-status agentic workflow added πŸ€–

πŸ“Š Project Status

Phase Progress

Phase Description Status
Phase 1 Core Streaming MVP βœ… Complete
Phase 2 Settings & Configuration πŸ”„ In progress
Phase 3 Resilience & Polish πŸ”œ Up next
Phase 4 Secondary features ⏳ Queued
Phase 5 Overlay, H.265, SRT, multi-dest 🚫 Out of scope

The QA test suite (T-035) completing with 150 passing tests is a big milestone β€” great signal that the data layer and core logic are solid. πŸŽ‰

Key Architecture Health

  • πŸ” Credential storage: EncryptedSharedPreferences + Keystore β€” βœ…
  • πŸ”’ FGS security: profile ID only in Intent extras β€” βœ…
  • πŸ›‘οΈ Log redaction: CredentialSanitizer in place β€” βœ…
  • πŸ—οΈ Encoder serialization: Mutex-guarded EncoderController β€” βœ…

🎯 Recommended Next Steps

  1. πŸ“‹ Review & merge PR #5 β€” The energy-saving stream fix is ready and critical for usability. The pure-UI-overlay approach is architecturally correct and doesn't touch the encoder.

  2. πŸ—‘οΈ Close PR #6 β€” The draft for the unrelated calendar query can be closed as it has no actionable scope.

  3. βš™οΈ Phase 2 settings screens β€” With Phase 1 solid, EndpointScreen, VideoAudioSettingsScreen, and GeneralSettingsScreen are the natural next targets.

  4. πŸ”„ Reconnect & ABR β€” ConnectionManager exponential backoff and AbrPolicy are key resilience features for Phase 3.

  5. πŸ§ͺ Instrumented tests β€” Consider adding connectedFossDebugAndroidTest coverage for the FGS lifecycle and surface binding.


Auto-generated by the daily-repo-status workflow πŸ€– | StreamCaster v0.0.1

Generated by Daily Repo Status Β· β—·

To install this agentic workflow, run

gh aw add githubnext/agentics/workflows/daily-repo-status.md@1199e4a230756fb94a382496a73e689091aa4b6b

Metadata

Metadata

Assignees

No one assigned

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions