Skip to content

chore: sync main into develop after v0.2.0 release #29

chore: sync main into develop after v0.2.0 release

chore: sync main into develop after v0.2.0 release #29

Triggered via pull request February 19, 2026 16:10
Status Failure
Total duration 27s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.10)
Process completed with exit code 1.
test (3.12)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
test (3.11)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_12" failed
test (3.9)
The operation was canceled.