Skip to content

added 2.13 compatibility #3

added 2.13 compatibility

added 2.13 compatibility #3

Triggered via push September 5, 2025 14:04
Status Failure
Total duration 42s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test (2.13.16, 21)
Process completed with exit code 1.
test (2.12.20, 21)
Process completed with exit code 1.
test (2.12.20, 21)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.12.20, 8)
The operation was canceled.
test (2.12.20, 8)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.13.16, 17)
The operation was canceled.
test (2.13.16, 17)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.13.16, 11)
The operation was canceled.
test (2.13.16, 11)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.12.20, 11)
The operation was canceled.
test (2.12.20, 11)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.12.20, 17)
The operation was canceled.
test (2.12.20, 17)
The strategy configuration was canceled because "test._2_13_16_21" failed
test (2.13.16, 8)
The operation was canceled.
test (2.13.16, 8)
The strategy configuration was canceled because "test._2_13_16_21" failed