Skip to content

added sbt to build

added sbt to build #2

Triggered via push September 5, 2025 12:16
Status Failure
Total duration 39s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (2.12.20, 8)
Process completed with exit code 1.
test (2.12.20, 21)
Process completed with exit code 1.
test (2.12.20, 17)
The operation was canceled.
test (2.12.20, 17)
The strategy configuration was canceled because "test._2_12_20_21" failed
test (2.12.20, 11)
The operation was canceled.
test (2.12.20, 11)
The strategy configuration was canceled because "test._2_12_20_21" failed