Production Readiness Checklist

Use this checklist before opening production traffic to a new Claw deployment or after a major platform change.

Mark each item as PASS or FAIL. A FAIL blocks go-live until remediated or accepted through your formal exception process.

How to use

  • Scope one environment at a time (for example: prod-us-east-1).
  • Record evidence links for each check (run output, screenshots, ticket IDs, dashboards).
  • Keep this checklist with your release record.

Readiness checks

Area Check PASS criteria FAIL criteria
Install Production install path is reproducible Install completed using documented production steps; exact version and install method are recorded; claw --version matches planned release Install required ad-hoc/manual fixes, version is unknown/mismatched, or steps are not reproducible
Auth/TLS Authentication is enforced for daemon access Daemon is started with bearer auth (--auth-token or --auth-profile); unauthenticated request is rejected Daemon accepts unauthenticated requests or auth configuration is unknown
Auth/TLS Transport is encrypted in transit TLS termination is configured at ingress/proxy or daemon TLS is enabled; certificate is valid and not expired; plaintext endpoint is not reachable from production networks TLS is missing/misconfigured, certificate is invalid/expired, or plaintext access is exposed
Backups Backup jobs run on schedule Automated backup schedule exists, ran successfully within the required window, and latest backup artifact is present No schedule, missed backup window, or backup artifact missing
Backups Backup integrity is verified Most recent backup passes verification (claw admin backup verify or equivalent process) and verification result is stored Backup verification not executed, failed, or evidence is missing
Rollback Rollback plan is tested for this release path Operator can execute documented rollback procedure and restore service/data to previous known-good state within target time Rollback steps are untested, incomplete, or cannot restore service in target time
Compatibility Client/server compatibility is validated Supported client versions are tested against deployed daemon version and behavior matches published compatibility guarantees Required client versions fail, are untested, or compatibility status is unknown
Security scans Required security scans pass Required scans (dependency, container/image, and/or static analysis per policy) completed for this release with no unapproved critical/high findings Scans were skipped, failed, or unresolved critical/high findings exist without approved exception
Signed artifacts Release artifacts are signed and verified Published binaries/images are signed by trusted keys and signature verification was performed before deployment Artifacts are unsigned, key trust is unknown, or verification was not performed
Runbooks Operator runbooks are complete and current Runbooks exist for startup/shutdown, backup/restore, token rotation, incident response, and rollback; each runbook was reviewed/updated for this release Required runbooks are missing, stale, or do not match current deployment
SLOs SLOs and alerting are defined and active Availability/latency/error-budget SLOs are documented; dashboards and alerts are active; on-call knows escalation path SLOs are undefined, alerts are missing/noisy, or escalation path is unclear

Go-live gate

  • Go-live allowed only when all checks are PASS or formally waived.
  • If any check is FAIL, record owner, remediation action, and target completion date before proceeding.