- Verify requirements per RTM
- Validate interfaces per ICD/IO map
- Confirm safe commissioning + basic functional operation
- Component tests (sensors, actuators)
- Subsystem tests (motion + sensing)
- System tests (integrated cycle)
- Safety tests (interlocks, E-stop, fault handling)
- Release lock established
- IO validation complete
- Facilities prechecks passed
- All Must requirements verified
- No open Sev-1 issues
- Evidence linked in RTM
- Update RTM status after every execution batch
- Store evidence under
docs/test/evidence/(redacted if external)