List view
You will upload and present the game running on an Android tablet and iPad the Game must contain the following, Your game must include: • UON Games Splash Screen (that can be skipped) • PEGI label and The PEGI Content Descriptors (that can be skipped) • Animated intro sequence/ title screen (that can be skipped) • Main menu ▪ The tutorial level can be level one ▪ Minimum one playable level ▪ In-game pause menu ▪ End screens (win and lose). ▪ Option screens with as much functionality as possible ▪ Accessibility considerations ▪ Credits Pages ▪ Quick & restart option CSY1077 Group Game Project: Fundamentals • Sound and Music: Sound must be Copywrite free and credited • Readme file .txt
Overdue by 9 month(s)•Due by May 6, 2025•1/1 issues closedFor this Milestone, you will conduct a public Gameplay Beta of your game. This will be done away from the game labs in a public space like the Learning Hub and documented as a table. Gameplay Testing is about getting others to play your game and logging the good, the bad, and the ugly so you can make improvements to your game. Both Tables will need to be uploaded as one document in Word Doc file format to the Milestone hand-in slot. Check the hand-in date on the hand-in slot.
Overdue by 9 month(s)•Due by April 22, 2025•1/1 issues closedFor this Milestone, you need to submit a Functionality Testing Table showing that everyone on your team has wholly tested every element of your game. Functionality Testing Table is about testing components of the game see examples below. Testing Art • All artwork is to the correct scale • Colours work correctly • Animations work • Cropping of objects is correct • Quality of work matches the style set by the team • Shaders Testing Design • UI adjust to screen size • Sound and Music • Balance of the game • Spelling and grammar • Mechanics work as expected • Level design works • Lighting • Post-Processing Testing Code • All navigation links work • Player controls • Enemies move correctly • Scoring • Pickup’s • Hitbox’s • Health • Hosting You will need to ensure that testers' names and dates are added to the table. Again, use screenshots to help show the Bugs.
Overdue by 10 month(s)•Due by March 25, 2025•1/1 issues closedFor this Milestone, you will present and discuss your team's final design decisions and planning (you should have already started making the game at this point). You will need to present it in the session and upload it to the milestone submission point. Names next to each team member’s contribution need to be added to the work done: 1. GDD Game Design Document must use the Y1 GDD template. 2. OneSheet updated 3. Pseudocode for all the code you proposed to be created for the core game. Not all of it will end up in the game. This should be annotated to explain what code going in the final game. CSY1077 Group Game Project: Fundamentals 4. Art Guide, Level map/location layout and UI Design: You should Include the concept, not the final pieces. Include annotation, especially if the image did not make the final game (explaining why it may not be used). 5. Team responsibility list a list of each member of the team the roles and a description of the responsibilities 6. Production Scheduling, Gantt chart containing each task, who is responsible, estimated start, and finish date, Milestones and testing. 7. Scrum Board with 3 weeks of progress with changes for the first 3 weeks. 8. Weekly meeting minutes x 3 meeting minutes consist of at least three entries. Submission will need to be uploaded as one document in Word Doc file format to the Milestone hand-in slot check hand-in date on the hand-in slot.
Overdue by 11 month(s)•Due by February 18, 2025•1/1 issues closedFor this milestone, you will present your chosen game idea, basic development plan, one sheet, and Gantt chart and how they fit the brief. The list below is just some suggestions of what you can cover: • Your team • Game idea, why this idea • The sound of the game • Use of the Platform • Thoughts on PEGI • About your target audience • UPS • Basic development plan (Gantt chart) Your lecturer will film and upload the pitch, so you will need to upload your One Sheet and Gantt chart to Milestone's hand in the slot.
Overdue by 1 year(s)•Due by February 4, 2025•1/1 issues closed