-
Notifications
You must be signed in to change notification settings - Fork 0
Open
Description
Hi,
I was using the ESDL Analytics to get the CAPEX of infrastructure.
The CAPEX was about 520Meuro.
The route (tracé) length is about 80km
That makes the average trace prize 6400 euro/m
To me that is very high.
So I looked at the price in the EDR database (see uploaded image)
I also downloaded and exported the ESDL to an excel (see uploaded excel)
And I realized that ESDL Analytics sums supply and return and multiplies it the the EDR prices.
So my quastion:
Is the EDR price a 'trace' price or a 'single pipe' price.
Metadata
Metadata
Assignees
Labels
No labels
