Skip to content

Presentation run-through notes #8

@smoyer64

Description

@smoyer64

Timing:

  • 12 minutes for introduction/Architecture/Features
  • 30 minutes up to Extensibility
  • 45 minutes after to Future
  • 48 done

Fixes:

  • Rearrange slides 20 & 21 to enlarge text
  • Remark that @disabled replaces @ignore and the icon means "skipped"
  • Title and bitly link in white-bold text on bottom blue border
  • Note that XML output is snipped to "relevant portion"
  • Some links in grey are still different
  • Fix gray bubble in slide 47
  • Swap slides 47 and 48
  • Delete slide 49
  • Slide 63 highlighting is wrong
  • Mention that the callback precedence is for each "callback type"
  • Change failure message in AffiliateDetector
  • Animate bullets on slides with lots of text or items (as needed)
  • Note that signatures for assertions changed from JUnit 4 to 5
  • assert...(expected, actual) -> assert...(expected, actual)
  • assert...(message, expected, actual) -> assert...(expected, actual, message)
  • This was on purpose

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions