Skip to content

Brainstorm Risk Analysis Procedures #41

@achimstruve

Description

@achimstruve

Let us brainstorm about useful risk analyses procedures that can be built on top of the core model and the already existing spreadsheet outputs.

In other words:

  • What are relevant risk KPIs and how can we express them for the token economy / stakeholders?
  • Which KPIs can we leverage to determine the economic feasibility of a project or a certain input scenario?
  • How do we want to present these risk related metrics?
  • Do we want to work with safety margins? How would this look like?

Metadata

Metadata

Assignees

No one assigned

    Labels

    no codeNo coding required to solve this

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions