List view
This final sprint before the competition is all about ensuring everything is perfect and ready for prime time. Goals: - Conduct final end-to-end testing, including regression testing. - Complete all remaining documentation (user manuals, technical guides, release notes). - Perform final code reviews and ensure adherence to coding standards. - Prepare all necessary assets for competition (e.g., deployment scripts, final software builds). - Address any last-minute critical bugs or issues. Key Deliverables: Final tested software build, complete documentation package, competition-ready deployment.
Due by May 22, 2026•1/3 issues closedThis is a critical sprint for validating our software in a simulated environment and preparing for real-world testing. Goals: - Integrate the rover software with the simulator for extensive virtual testing. - Run comprehensive test scenarios within the simulator to identify edge cases and system failures. - Address any issues arising from simulator testing. - Begin preparing for hardware-in-the-loop (HIL) testing. Key Deliverables: Fully integrated simulator environment, detailed simulator test reports, readiness for HIL testing.
Due by May 8, 2026•1/3 issues closedWith the core system integrated, this sprint shifts focus to performance and stability. This is crucial for a reliable rover. Goals: - Optimize code for performance and efficiency across all subsystems. - Conduct thorough bug fixing based on testing feedback. - Refine existing features based on initial performance metrics. - Update technical documentation to reflect current system state. Key Deliverables: Optimized code commits, comprehensive bug fix logs, updated performance metrics.
Overdue by 1 month(s)•Due by March 20, 2026•9/13 issues closed