Skip to content
AllanHarte edited this page Mar 1, 2017 · 23 revisions

###Gold remodelling on a Ni-based superalloy RR1000

  • Figure 1 demonstrates a matrix of sputter time (assumed 1 min = 10nm) and remodel time at temperature ~200°C Masters thesis, Carsten Drouven 2016 Figure 1

The ideal pattern is at 50nm Au sputtering layer (5 min) and 6hr water remodelling

  • NOTE: at a temperature of 300°C this ideal pattern is obtained in 3 hours!

Clone this wiki locally