Skip to content

Fix integrated system errors and improve functionality #4

Fix integrated system errors and improve functionality

Fix integrated system errors and improve functionality #4

Triggered via push September 5, 2025 10:09
Status Failure
Total duration 2m 8s
Artifacts

ci.yml

on: push
Matrix: lint-and-test
pre-commit
40s
pre-commit
Fit to window
Zoom out
Zoom in

Annotations

8 errors
pre-commit
Process completed with exit code 1.
lint-and-test (3.8)
Process completed with exit code 1.
lint-and-test (3.10)
The operation was canceled.
lint-and-test (3.10)
The strategy configuration was canceled because "lint-and-test._3_8" failed
lint-and-test (3.9)
The operation was canceled.
lint-and-test (3.9)
The strategy configuration was canceled because "lint-and-test._3_8" failed
lint-and-test (3.11)
The operation was canceled.
lint-and-test (3.11)
The strategy configuration was canceled because "lint-and-test._3_8" failed